Marabu Facility Upfit

North Charleston, SC

 

As Marabu grew its North American market, the company chose to relocate to a facility that better suited its business. The new space needed some renovations and Marabu contracted with Berenyi Inc. to design and build their new storage and production areas.

The first step in the upfit was to divide the existing building space using a 4 hour fire wall. This requirement was determined after the design team worked extensively with the North Charleston building department and the Fire Marshal. The production equipment was then relocated to the new space complete with dust collection systems, pneumatic lines, and proper ventilation.

The new space provides Marabu with larger area to produce their inks and dyes and streamlines their operations.