East Beach Conference Center Loading Dock Replacement

Kiawah Island, South Carolina

 

Facilities managers took proactive steps once corrosion damage was identified at the rear loading dock of the East Beach Conference Center. Berenyi Incorporated visited the site to view the corroded structural framing, likely caused from years of using cleaning solutions on the loading dock surface.

The corrosion damage was sever, Berenyi demolished the loading dock to expose the extent of the damage. As opposed to attempting to shore the exterior wall of the building to place new framing in the tight confines under the building our creative crew doweled reinforcement into the existing piles and poured concrete beams under the wall. This method allowed for safer construction, eliminated the need to reestablish steel framing under the load bearing wall, and will reduce the potential for future corrosion.

Services Provided (click service below to browse projects)

Construction Management Construction Services Facility Upgrades Foundation Construction General Contractor Industrial Engineering Structural Design