• Remove existing floor panels
  • Receive new steel
  • Off loading steel
  • Preassemble steel
  • Assembling steel frame
  • Reset first panel after Phase 1 install
  • Motank cable reel base plate
  • Remove floor for Catfis installation
  • Motank rail and bumper install
  • Final rail install
  • Motank in position and in use

ArcelorMittal Motank Installation

Georgetown, SC

 

ArcelorMittal looked to update its melt shop operations using new equipment (Motank and Catfis). Berenyi was awarded the contract for the installation of the new equipment. The work will be completed in phases to allow ArcelorMittal to maintain most of their normal operation hours.

 

Services Provided (click service below to browse projects)

Construction Services Equipment Installations Facility Upgrades General Contractor Heavy Industrial Construction Heavy Structural Steel Industrial Systems Plant Shut Down Steel Erection